Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
W071 ENDIST PORTLAND
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a con
