FAR 31.201-4

Determining allocability.

A cost is allocable if it is assignable or chargeable to one or more cost objectives on the basis of relative benefits received or other equitable relationship. Subject to the foregoing, a cost is allocable to a Government contract if it- (a) Is incurred specifically for the contract; (b) Benefits both the contract and other work, and can be distributed to them in reasonable proportion to the benefits received; or (c) Is necessary to the overall operation of the business, although a direct relationship to any particular cost objective cannot be shown.

Source: acquisition.gov — FAR

Have a solicitation to win?

Paste it into the free Contrax bid scorer — get an AI win-probability score with the FAR clauses that matter, in seconds. No signup required.