DFARS 252.247-7014

Demurrage.

As prescribed in 247.271-3 (c), use the following clause: DEMURRAGE (DEC 1991) The Contractor shall be liable for all demurrage, detention, or other charges as a result of its failure to load or unload trucks, freight cars, freight terminals, vessel piers, or warehouses within the free time allowed under applicable rules and tariffs. (End of clause)

Source: acquisition.gov — DFARS

Have a solicitation to win?

Paste it into the free Contrax bid scorer — get an AI win-probability score with the FAR clauses that matter, in seconds. No signup required.