DFARS 236.604

Performance evaluation.

Prepare a separate performance evaluation after actual construction of the project. Ordinarily, the evaluating official should be the person most familiar with the architect-engineer contractor’s performance.

Source: acquisition.gov — DFARS

Have a solicitation to win?

Paste it into the free Contrax bid scorer — get an AI win-probability score with the FAR clauses that matter, in seconds. No signup required.