LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
W071 ENDIST OMAHA
Due Dec 3, 2026 · 31 days leftSmall Business Set Aside - Total
What the job is
The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water…